The Bridge Pt. 2 (permanent location construction)

With The Bridge finding a permanent space, we needed to create a plan that accommodated there growth and venue change, while, temporarily or permanently, also utilizing what they've already accumulated. 

We started by flying their D.A.S. Active 12 PA and simply taking their Midas M32R out of it's case and had a working sound setup. For lighting we deployed 6 Elektralite eyeball 5-in-1 fixtures along the back wall and sides of the stage. Because of the size of the room, we decided to, again, go with TV's instead of projectors for their video needs.